Metal garage installation: the main steps

KETMIAGARAGE · DELIVERY & INSTALLATION IN GERMANY

Metal garage installation: the main steps

From a prepared foundation to the final check, installation follows the agreed garage specification.

1. Prepare the site

Check foundation dimensions and level, confirm the position of doors and keep the delivery route and assembly area clear.

2. Deliver and assemble

The components are delivered and the frame is positioned and assembled. Wall and roof elements are fitted according to the specification.

3. Fit doors and accessories

The agreed garage doors, side doors, windows and other equipment are fitted. The actual sequence depends on the design and site.

4. Fix and check

The structure is fixed to the prepared foundation and checked. Discuss open questions about access, preparation or equipment before installation day. This is an overview of our process, not a substitute for project-specific assembly instructions.