Foundations and installation

KETMIAGARAGE · DELIVERY & INSTALLATION IN GERMANY

Foundations and installation

A prepared foundation and clear access help your delivery and installation run smoothly.

The customer prepares the foundation

Agree the required dimensions and foundation arrangement for your garage before construction. It must be ready by the installation date. The appropriate solution depends on the structure and site; do not assume an existing paved surface is suitable without checking.

What to check before delivery

Confirm the foundation dimensions, level, load-bearing suitability and planned fixing points. Keep the approach and working area clear. Send photographs if anything about the site or access is uncertain.

What happens on installation day?

The structure and components are delivered, positioned and assembled. The frame, walls, roof, doors and agreed accessories are installed, followed by fixing and a final check. The exact sequence depends on the design.

Agree a realistic schedule

The approximate one-month garage lead time refers to the period from order, not the time spent assembling on site. On-site duration depends on size, equipment, access and conditions. We agree the exact date and preparation with you.

Plan the next step